Georgia Power EV Incentive Program

Get Your Georgia EV Infrastructure Funded.

Leverage rebates of $250/kW for Level 2 and up to $30,000 for DC Fast Charging. We maximize your funding and handle the turnkey installation — from rebate application to energized charger.

Run My Georgia Savings Estimate No obligation · Georgia-licensed installation
Free Savings Estimate

How much can you recover?

Tell us about your property and we'll calculate your Georgia Power rebate potential.

Your information is only used to calculate your rebate estimate. No spam.

$250 / kW
Level 2 Charging
Rebates cover up to 50% of total equipment and installation cost for qualified Level 2 stations.
Up to $30k
DC Fast Charging
Based on $150/kW rebate rating — up to $30,000 per DC Fast Charger unit installed on your property.
100% Funded
Infrastructure Make-Ready
Georgia Power may cover 100% of infrastructure and behind-the-meter costs for qualified commercial sites.
Georgia Power rebate applicants
Georgia-licensed electricians
Turnkey from assessment to energized
No upfront cost to assess your savings

Stop leaving Georgia Power money on the table.

These incentives are time-limited and capacity-based. Early applicants capture the largest rebates before program funds are exhausted.

01

Rebates cover half your total project cost

Level 2 rebates at $250/kW can offset up to 50% of combined equipment and installation expenses — a direct, dollar-for-dollar reduction in capital outlay.

02

Make-Ready funding eliminates infrastructure risk

Georgia Power's Make-Ready program can absorb 100% of the electrical infrastructure build-out — conduit, panels, wiring — for qualifying sites. You pay for chargers, not construction.

03

We manage every step of the rebate process

Stay-N-Charge prepares and submits your Georgia Power application, coordinates inspections, and delivers certified installation documentation — maximizing your approved rebate amount.

04

Increase asset value and attract premium tenants

EV charging is now a top amenity for commercial tenants and residents. Properties with charging infrastructure command higher rents and lower vacancy rates in today's market.

Sample Rebate Scenario

10-Unit Level 2 Installation: What the numbers look like

Based on 10 × 7.2 kW Level 2 chargers at a commercial property — before Make-Ready infrastructure funding.

72 kW
Total Capacity
$18k
Rebate Earned
~$36k
Est. Project Cost
50%
Cost Recovered
Make-Ready Bonus
~$25,000 in electrical work — covered by Georgia Power
Conduit, panel upgrades, and all behind-the-meter infrastructure installed at no cost to you under the Make-Ready program. Combined with the $18k rebate, your effective out-of-pocket drops to roughly $11,000 on a ~$36k project.

Figures are illustrative. Actual rebate amounts depend on equipment specifications and Georgia Power program eligibility. Make-Ready funding may reduce your net cost further. Request a free estimate for your property.

From application to revenue-generating charger in four steps.

1

Free Site Assessment

We evaluate your property, electrical capacity, and project scope to identify maximum Georgia Power rebate eligibility.

2

Rebate Application

Stay-N-Charge prepares and submits your complete Georgia Power rebate application, including all required technical documentation.

3

Certified Installation

Our Georgia-licensed electricians complete the full installation to spec, ensuring compliance with utility and building code requirements.

4

Rebate Check & Go-Live

We submit final inspection reports to Georgia Power, secure your rebate payment, and activate your network-managed charging stations.

Built for Georgia's commercial real estate market.

Office & Commercial

Add a premium tenant amenity and comply with EV-ready building standards for new leases.

Multifamily & HOA

Meet growing resident demand with compliant, managed Level 2 charging across your parking facilities.

Retail & Hospitality

Attract EV-driving customers and increase dwell time with DC Fast Charging at high-traffic locations.

Fleet & Industrial

Optimize fleet operations with managed depot charging and unlock Georgia Power's fleet incentive tiers.

Limited Program Availability

Your Georgia property qualifies.
Find out how much.

Georgia Power's EV incentive funds are allocated on a first-come basis. The longer you wait, the less funding is available. Get your free estimate in under 60 seconds.

Free, no-obligation estimate
Georgia-based team
Responds within 1 business day